Miss Walsh, I just needed to check I'm not being really stupid here. The mark scheme is R+P (20), Eval (20) and construction (40)- therefore the final mark should be out of 80, NOT 100 as specified on the mark Sheet!Mr Mc
Post a Comment
1 comment:
Miss Walsh, I just needed to check I'm not being really stupid here. The mark scheme is R+P (20), Eval (20) and construction (40)- therefore the final mark should be out of 80, NOT 100 as specified on the mark Sheet!
Mr Mc
Post a Comment